Bar Operations Playbook: Run the Same Bar Every Shift
Your Tuesday manager and your Friday manager are running two different bars in the same room. This page is how you make it one bar, with the checklists to run it from.
You Are Running Two Different Bars
Ask two of your people how they close the bar and you will get two different answers. Ask three how they pour a well drink and you may get three. That is not a discipline problem. It is what happens when most of what a bar does has never been written down, so it lives in whoever happens to be working.
Everybody who learned the job learned it from a different person, on a different night, and nobody was ever told what the standard actually is. So your Tuesday manager and your Friday manager run two different bars in the same room, and the gap between them turns up in your pour cost, your average check and your inspection results without anybody tracing it back to the cause.
None of your other systems survive a bar that does not run the same way twice
A pour standard nobody was trained to is a piece of paper. A weekly count that happens on three weeks out of four gives you numbers you cannot act on. A briefing that only runs when one particular manager is on lifts the average check on their shifts and nobody else's. Everything in the profit, revenue and cash playbooks assumes the work actually happens, on every shift, whoever is on. That assumption is what this playbook is about.
The Four Ways It Shows Up
It is rarely one thing, and none of it looks like an operations problem when you meet it. It looks like a cost problem, a staffing problem or bad luck.
| How it shows up | What it looks like | Example cost |
|---|---|---|
| Shifts that do not match | The same night of the week does noticeably different sales depending on who is running it, and nobody can say why. | A few hundred dollars a shift, every shift that manager works. |
| People trained by watching | New starters learn from whoever is on, so every one of them picks up a slightly different version of the job. | Weeks longer to become useful, and a pour standard that drifts with every hire. |
| Equipment fixed when it breaks | Nothing gets serviced until it stops, which is always on a Friday. | An emergency call-out costs several times a planned service, plus the trade you lose. |
| Nothing written down | An incident, a refusal or a complaint is remembered rather than recorded, and a licence renewal is noticed late. | One bad outcome can cost more than every other line on this page put together. |
What the Gap Between Your Shifts Is Worth
The clearest way to see this is to compare the same night of the week under two different people. Take a Friday when your strongest manager is on and a Friday when your weakest is, and put both in below.
What your best shift and your worst shift differ by
InteractiveUse the same night of the week, so you are comparing like with like. Nothing is sent anywhere; the arithmetic runs in your browser.
The fix is writing things down, which is why nobody does it
There is nothing clever in this playbook. It is checklists, a training record, a service schedule and a log. The reason most bars do not have them is not that they are hard. It is that none of them are urgent on any particular day, and the cost of not having them arrives quietly, spread across every shift, so nobody ever sits down and adds it up.
Getting Consistent Has a Timeline
The first 30 days are about writing down what already happens, not changing it. You follow your best closer around and write down what they do. You list every piece of equipment and find out when it was last serviced. You find the licences and put the dates somewhere. Those first lists are your baseline, which is what everything later gets measured against.
Days 30 to 60 are where it starts running. The checklists are in use and getting signed, the first new starter is trained against a written list instead of by watching, and the service dates are in the calendar. This is the part that feels like admin and is not: you are moving the bar out of people's heads and onto paper.
By day 90 the difference is visible in the other numbers. Your quiet shifts stop being noticeably worse than your busy ones, the count happens every week instead of most weeks, and things stop breaking at the worst possible time because somebody looked at them first.
| Phase | What is happening | What to expect |
|---|---|---|
| Days 1-30 | Writing down what already happens: the open, the close, the equipment, the licences | No results yet. You are recording the bar as it is, not changing it. |
| Days 30-60 | Checklists in use and signed, the first trained starter, service dates in the calendar | Fewer things missed at open and close, and less firefighting |
| Days 60-90 | Incidents recorded on the night, licences tracked, the routine running without you | Your weaker shifts start looking more like your stronger ones |
| Day 90+ | Every system running, with a monthly look at what gets skipped | The bar runs the same way whoever is on, which is the whole point |
The usual place this breaks is around week three, when the checklists start getting signed without actually being done. That is a real risk and it has a simple fix: put two or three items on the list that cannot be faked, such as writing down a temperature or a till figure, and check those.
Would Your Bar Run the Same Without You?
Ten questions, yes or no, with no partial credit. If the honest answer is "most of the time", that is a No. Either it happens on every shift or it does not.
The test running through all of them is simple: if you went away for two weeks, would the bar run the same way? The monthly figure beside each No is an example of what that gap commonly costs. It is not a measurement of your bar.
01Is there a written opening and closing checklist that gets used and signed on every single shift?
02Is there a written list of what somebody has to be able to do before they work a shift on their own?
03Do you walk the room at set points during service and check the same handful of things every time?
04Is there a list of every piece of equipment with how often it needs servicing and when it was last done?
05Are your temperatures written down every day, in a place somebody could hand to an inspector?
06Is there one place listing every licence, permit and certificate with its renewal date?
07Does every injury, ejection, refused service and complaint get written down on the night it happens?
08Is there a written cleaning schedule covering the weekly and monthly jobs, not just the nightly ones?
09Does the manager coming on shift read what happened on the shift before?
10If you went away for two weeks, would the bar run the same way without you?
Answer the ten questions above and your score builds here.
These are example figures. They are common costs for each gap, not a measurement of your bar.
- Everything you have not written down is being done differently by at least two people right now.
- A checklist nobody signs is a suggestion. A checklist somebody signs is a record, and that one difference is most of the value.
- The equipment that will stop you trading next is the one nobody has looked at, and you already know which one it is.
- The record you did not make on the night is the one you will wish you had, and you will not know which one that is in advance.
- If the bar only runs properly when you are in it, you do not have a business yet, you have a job with unusually long hours.
Every Gap: What Closes It, and What It Protects
Before the systems themselves, here is the whole picture on one screen. For each gap: the piece of paper that closes it, and which of your other numbers it was quietly damaging.
| The gap | What closes it | What it was costing | System |
|---|---|---|---|
| The open and close | Two written checklists that get signed every shift | Pour cost, waste, and a slow start that eats the first hour of trade | System 1 |
| Service itself | A short walk of the room at set points, checking the same things | Average check, drink quality, and tabs that walk out unpaid | System 2 |
| New people | A written list of what they must be able to do, signed off item by item | Pour cost, speed of service, and weeks of a wage before they produce | System 3 |
| Equipment | A list of everything that can stop you, with service dates in the calendar | Emergency call-outs, lost trade, and product thrown away | System 4 |
| Licences and permits | One register with every renewal date, checked monthly | Fines, and the days you cannot trade if one lapses | System 5 |
| What happened | An incident record written on the night, facts only | Everything, in the one case a year where it matters | System 6 |
The middle column is the point of this playbook. None of these is an operations cost on its own. They are all costs somewhere else, showing up as a pour cost that will not come down, an average check that varies by night, or an emergency invoice nobody planned for. This page is the underneath of the other three.
Everything above is a piece of paper somebody has to keep. Bar Cop keeps them together and remembers the dates. Build Checklists is where you write your opening and closing lists, and Run Checklists is where somebody ticks them off on the night, with the completed runs kept. Staff Training holds a checklist per role and records who was signed off on what. Maintenance tracks what is broken and how urgent it is, and anything open shows on the Hub. Licensing holds every permit with its renewal date and flags the ones inside thirty days. Incidents and Walked Tabs are the written records of what happened.
The Numbers to Run Against
Operations has fewer numbers than the other three playbooks, and the ones it has are mostly about whether things happen rather than what they cost. These are the ones worth tracking. Put your own figure in below and it will tell you where you sit.
Where does your number land?
InteractivePick a measure, enter what you are running, and see it against the tables below.
Whether Things Actually Happen
| Measure | Target | Warning | Critical | What it usually means |
|---|---|---|---|---|
| Checklists completed and signed | 98%+ | 90-97% | Under 90% | Below 90 percent the list has become optional, and everybody on the floor knows it. |
| Temperature logs completed | 100% | 95-99% | Under 95% | This is the one an inspector asks for first, and a gap in it is hard to explain away. |
| Shift handover notes written | 95%+ | 80-94% | Under 80% | Below 80 percent each shift is starting from nothing and rediscovering the same problems. |
| New starters signed off before working alone | 100% | 80-99% | Under 80% | Anybody working alone without a sign-off is a standard you have not actually set. |
How Often Things Need Doing
| Job | How often | What happens if it slips |
|---|---|---|
| Draft line cleaning | Every 2 weeks | Build-up changes the taste before anybody spots a problem, and the first sign is usually a line pouring badly. |
| Ice machine clean and sanitise | Every 3 months | It is a food contact surface that almost nobody inspects, and it is a common write-up. |
| Cooler and walk-in temperature check | Twice a day, recorded | A unit drifting warm is invisible until something spoils or somebody gets ill. |
| Extraction and hood cleaning | Quarterly, or as your insurer requires | It is a fire risk, and your insurance may depend on being able to show the dates. |
| Refrigeration service | Twice a year | Compressors fail with very little warning, and always on the night you are busiest. |
| Deep clean behind and under equipment | Monthly | This is where an inspection finds what a nightly clean never reaches. |
These are common intervals rather than rules. Your equipment manuals, your insurer and your local health authority all set their own, and where they differ from this table, theirs is the one that counts.
People
| Measure | Target | Warning | Critical | What it usually means |
|---|---|---|---|---|
| Staff turnover a year | Under 50% | 50-80% | Above 80% | Hospitality runs high everywhere, but above 80 percent you are paying to train people for somebody else. |
| Shifts called out a month | Under 3% | 3-6% | Above 6% | A rising call-out rate is usually a scheduling or a morale problem rather than an illness one. |
| Days to get a new starter working alone | Under 14 | 14-28 | Over 28 | Long ramp-up almost always means training by watching rather than against a list. |
Seven Systems, One Standard
These are not seven separate jobs. A checklist works only if the people using it were trained to the same standard. Training holds only if somebody checks during service that it is still being followed. Equipment and licences are the two that never announce themselves until they stop you trading. And the record of what happened is the one that matters rarely and enormously.
They are in this order on purpose. Write the open and the close down first, because that is the largest amount of work being done from memory and the quickest to fix. Everything after it is easier once the bar has one written routine in it.
Write down the open and the close first, because it is the biggest pile of work living in people's heads and the easiest to get out. Then train against a written list, so everybody is doing the same version of it. Then check during service that it is actually happening, because a routine nobody checks quietly becomes optional. Equipment and licences run on their own schedule and need nothing but a date in a calendar. The incident record is the odd one out: it costs almost nothing to keep and you will not know which entry mattered until long afterwards.
Open and Close the Same Way
A bar with three closers had three closes. One rinsed the drip trays and one did not. One counted the drawer with a second person and one did it alone. One wrote down what was running low and two did not, so the ordering was guesswork on two mornings out of three. Nobody was doing anything wrong, because nobody had ever been told what right was.
The open and the close are where the most unwritten work sits, and they are the easiest thing in this playbook to fix, because you do not have to invent anything. You follow your best closer round for one shift and write down what they do. That is the list.
What turns a list into a system is the signature at the bottom. An unsigned checklist is a suggestion. A signed one is a record, which means that when something is missed you are having a specific conversation with a specific person rather than wondering who was on. It also tells you, after a month, which items get skipped most, and that is usually a sign the item is in the wrong place on the list rather than that somebody is lazy.
Run It Without Software
- Follow your best closer for one shift and write down everything they do, in the order they do it. Do not design the list. Record it.
- Do the same with whoever opens best. Between the two you now have most of it.
- Put the items in walking order, not in importance order. A list that makes somebody cross the room four times gets shortened by whoever is using it.
- Add two or three things that cannot be faked. A temperature written down, a till figure, a number of kegs. These are what tell you whether the list was really done.
- Put a name and a signature at the bottom, and keep the sheets. This is the step that does most of the work.
- Print it and put it where the job happens, not in the office. A checklist in a drawer is a checklist nobody uses.
- Read a month of them once a month. Whatever gets skipped most is the item to look at, and usually the problem is the item, not the person.
The two lists below are a solid general open and close for a bar with a small kitchen. They are a starting point rather than an answer: take out what does not apply to you and add what is specific to your building. You can tick them off here, and the ticks stay in this browser, or print either one blank for a clipboard.
Opening ChecklistTick it off here, or print it blank for the clipboard.
Behind the Bar
The Floor
The Kitchen
Manager
Anything Wrong at Open
Anything broken, missing or running low. This is what the manager reads tomorrow morning.
This is a template for your own use. It is not legal, health or safety advice. Your own local health authority, your insurer and your equipment manuals set the requirements that apply to you, and where they differ from this list, theirs are the ones that count.
Closing ChecklistTick it off here, or print it blank for the clipboard.
Money and Records
Behind the Bar
The Floor and the Kitchen
Locking Up
Notes for the Morning
Anything broken, anything running low, anything the opener needs to know.
This is a template for your own use. It is not legal, health or safety advice. Your own local health authority, your insurer and your equipment manuals set the requirements that apply to you, and where they differ from this list, theirs are the ones that count.
Build Checklists is where you write your opening and closing lists once, and any extra ones for a particular station. Run Checklists is where somebody works through them on the night and ticks them off, and each completed run is kept, so you can look back at who closed on a given night and what was marked done. It will also print the same list blank if you would rather have it on a clipboard.
Running the Shift
Most problems on a shift are visible an hour before they cost anything. A bartender free-pouring, a table that has been waiting, a cooler door that is not shutting, a tab open since eight o'clock with nobody sitting at it. All of those are fixable in the moment and expensive afterwards, and the difference between the two is whether anybody walked the room.
A shift walk is not a performance review and it is not standing over people. It is a manager doing one lap at set points, looking at the same short list of things every time, and acting on what they see while it is still happening. Three or four minutes, two or three times a shift.
The reason it works is that it is predictable in frequency and unpredictable in timing. Everybody knowing a walk happens changes how the shift runs. Nobody knowing exactly when is what keeps that true after the first week.
Run It Without Software
- Pick three points in the shift: shortly after opening, at the busiest hour, and an hour before close. Vary the exact times, not the fact that it happens.
- Walk the same route every time, so you notice what is different rather than hunting for it.
- Look at the bar first. Is a jigger in use on every pour, are tools where they should be, is the well tidy enough to work from, is anything running low that will run out tonight.
- Look at the tickets. Anything open a long time with nobody at the table, anything voided in the last hour, anything comped without a reason on it.
- Look at the room. Any table waiting too long, any spill or hazard, restrooms still in a fit state, temperature and noise at the level you want.
- Look at the kitchen. Ticket times, whether anything is holding too long, and whether the line is still clean.
- Deal with what you find on the spot, and write down only what could not be fixed there and then. That short note is the handover.
The failure here is noticing something, meaning to deal with it later, and then getting busy. Everything you see falls into one of two buckets: fix it now, or write it down for the handover. Anything that goes into neither will be discovered again by somebody else in three days.
Every Shift
The things you find on a walk have somewhere to go. A tab that left without paying goes in Walked Tabs, which keeps the amount rather than letting it disappear into a vague shortfall at the end of the week. Something broken goes in Maintenance with a priority, and anything still open shows on the Hub so it does not fall between two shifts. A void or comp that needs a name against it goes in the Voids and Comps Log.
Training and Standards
Ask most operators how they train a new bartender and the answer is some version of putting them on with somebody good. That is not training, it is hoping. The new person learns whatever that particular shift happened to contain, from whoever happened to be on, and every hire after them learns a slightly different version again. Three hires later there is no standard left, only an average of everybody's habits.
Writing it down takes an afternoon, once. What somebody has to be able to do before they work a shift alone: pour to your measure, make your ten most-ordered drinks without looking them up, run the till including voids and comps, handle a refusal, close a tab, and open and close their own station. That list is the standard, and it does not change when the person training changes.
The part that makes it real is the sign-off. Each item gets ticked when the person demonstrates it, not when they have been shown it, and a manager puts their name and the date next to it. That single difference is what separates a trained employee from one who has watched somebody work.
Run It Without Software
- Write down what the job actually requires, role by role. Be specific: "pours 1.25oz using a jigger" rather than "knows how to pour".
- Split it into what is needed on day one and what can wait two weeks. Trying to teach everything at once is why people leave in the first fortnight.
- Train against the list, and tick each item when they show you, not when you have explained it. Watching somebody do it once is the whole test.
- Have a manager sign and date every item, and keep the sheet in their file.
- Do not let anybody work a shift alone until their list is complete. This is the rule that makes the rest of it mean anything.
- Re-check the basics after three months. Pour measure and till handling both drift, and a quick re-check costs nothing.
- When a standard changes, re-sign everybody on that one item, rather than mentioning it once at a briefing and assuming it landed.
What losing one person actually costs
InteractiveMost of this is invisible until it is added up. The last box is the part almost nobody counts: the weeks somebody is on full pay before they are producing like the person who left.
Every Hire
The Paper This System Needs
New Starter Training RecordSigned item by item. Nobody works alone until it is complete.
Tick each item only when the person has demonstrated it, and have a manager sign and date it. Add or remove rows so the list matches the job you are actually hiring for. The rule that makes this work is simple: nobody works a shift alone until every row is signed.
Before the First Shift
| Can do | Date | Signed by |
|---|---|---|
| Knows where the fire exits, extinguishers and first aid kit are | ||
| Understands the alcohol service laws that apply here and when to refuse | ||
| Can check identification and knows what is accepted | ||
| Has read and signed the pour standard and the staff handbook | ||
| Knows hand washing, sanitiser strength and cross-contamination rules |
Behind the Bar
| Can do | Date | Signed by |
|---|---|---|
| Pours the house measure with a jigger, checked against a spec | ||
| Makes the ten most-ordered drinks without looking anything up | ||
| Pours draft to the correct fill with acceptable waste | ||
| Opens, runs and closes a tab correctly | ||
| Processes a void, a comp and a refund to your rules | ||
| Handles a refusal of service calmly and knows who to call | ||
| Changes a keg and a gas cylinder safely | ||
| Opens their station to the checklist, unsupervised | ||
| Closes their station to the checklist, unsupervised | ||
| Counts a drawer and completes a drop with a second person |
Service
| Can do | Date | Signed by |
|---|---|---|
| Runs the table sequence: greeting, drink, starter, feature, dessert, close | ||
| Can describe every featured item and name a pairing for it | ||
| Knows the allergens on the menu and how to check one | ||
| Handles a complaint and knows when to fetch a manager |
Signed Off to Work Alone
This is a template for your own use. It is not legal, HR, or training advice, and it does not satisfy any certification your state requires. Alcohol service training and certification requirements vary by state and locality. Check what applies to you and have your attorney or HR advisor review this before you put it in force.
Staff Training holds a reusable checklist for each role and one record per person, so you can see at a glance who has been signed off on what and who is still working through their list. It is a record of what was completed rather than a course to sit through, which is the part most operators actually need.
Equipment and Maintenance
The glasswasher goes on a Saturday. The ice machine goes in July. The walk-in compressor goes on the night before a holiday weekend, and you lose the stock as well as the trade. None of these are bad luck. Equipment that is never looked at fails when it is worked hardest, which is exactly when you can least afford it and when an engineer costs the most to get out.
A planned service is a fraction of an emergency call-out, and the difference is only that somebody wrote a date down. The whole system is a list of everything that can stop you trading, how often each one needs attention, and when it was last done.
The second half is the log. When something does break, write down what it was, how urgent it is, and whether it has been dealt with. Without that, a repair that got promised on a Tuesday quietly falls between two managers and gets rediscovered a fortnight later by a customer.
Run It Without Software
- Walk the building and list every piece of equipment, including the ones you never think about: extraction, water heater, cellar cooling, the dishwasher.
- Against each one write how often it needs attention, from the manual if you have it and from the supplier if you do not.
- Write down when it was last done, even if the honest answer is that nobody knows. That tells you where to start.
- Put every one of those dates in the calendar, with a reminder a fortnight before. This is the entire system, and the rest is just doing it.
- Note the supplier and the serial number beside each item, so the person making the call at seven on a Friday is not also hunting for a model number.
- Keep a running log of anything that breaks, with how urgent it is and whether it has been fixed, and read it at every handover.
- Get the quotes for the expensive ones before you need them. Nobody negotiates well at eight on a Saturday night.
Planned service against an emergency call-out
InteractiveThe trade you lose is usually bigger than the repair bill, and it is the part nobody adds in when deciding whether to book the service.
Every Month
The Paper This System Needs
Equipment and Service ScheduleEverything that can stop you trading, and when it was last looked at.
One row for every piece of equipment, including the ones nobody thinks about. Once this exists, the whole system is putting the next-due dates in a calendar with a reminder a fortnight ahead. Keep the supplier and model number here too, so whoever is making the call on a Friday night is not also hunting for them.
The Schedule
| Equipment | How often | Last done | Next due | Supplier and number |
|---|---|---|---|---|
| Draft lines | Every 2 weeks | |||
| Ice machine | Quarterly | |||
| Walk-in and coolers | Twice a year | |||
| Glasswasher | Twice a year | |||
| Extraction and hood | Quarterly | |||
| Fire equipment | Annually | |||
| Cellar cooling | Twice a year | |||
Weekly and Monthly Cleaning
The jobs a nightly clean never reaches. Tick and date each one as it is done.
| Job | How often | Done, dated and initialled |
|---|---|---|
| Behind and under the bar, all the way to the wall | Weekly | |
| Cooler and walk-in shelving, emptied and washed | Weekly | |
| Ice machine, cleaned and sanitised | Quarterly | |
| Under and behind the line and the fryers | Weekly | |
| Drains and grease trap | Monthly | |
| Extraction filters | Monthly | |
| Cellar floor and keg racks | Monthly |
Breakdown Log
| Date | What broke | How urgent | Action taken | Fixed on |
|---|---|---|---|---|
This is a template for your own use. It is not safety, insurance or engineering advice. The intervals here are common ones, and your equipment manuals, your insurer and your local authority all set their own. Where they differ from this sheet, theirs are the ones that count.
Maintenance is the log: what broke, how urgent it is, and whether it is open, being worked on, or resolved. Anything still open shows on the Hub, so a repair promised on a Tuesday does not quietly fall between two managers. It deliberately holds no money, because a repair bill is entered once with the rest of your spending on Money Out rather than twice in two places.
Licences, Permits and Certificates
This is the shortest section in the playbook and the one with the worst downside. Every licence, permit and certificate you hold has a date on it, and the only thing standing between you and a very expensive day is whether anybody is looking at those dates. A liquor licence that lapses does not warn you, and depending on where you are it can stop you trading until it is sorted out.
The whole system is one list and one recurring reminder. It takes an hour to build and about five minutes a month to maintain, which makes it the best return on time anywhere in this playbook.
Run It Without Software
- Find every certificate in the building and every renewal notice in your email. Most operators find two or three they had forgotten about.
- Put them all on one list with what it is, the number, who issues it, the renewal date, what it cost last time, and where the certificate physically lives.
- Add the staff certifications too, such as alcohol service and food handling, because those expire per person and are easy to lose track of.
- Put every renewal date in a calendar with a reminder 60 days ahead, not 7. Some renewals need paperwork, an inspection or a fee that takes time.
- Check the list once a month, at the same time as something else you already do.
- Keep a copy of each certificate where you can find it in a minute, because that is roughly how long you will have when somebody asks.
How close is a renewal?
InteractivePut a renewal date in and see where it sits. The bands are the ones worth acting on rather than worrying about.
Every Month
The Paper This System Needs
Licence and Certificate RegisterOne list, every renewal date. An hour to build, five minutes a month.
One row for everything with an expiry date on it. Put each renewal date in a calendar with a reminder 60 days ahead, because some renewals need paperwork, an inspection or a fee that cannot be done in a week.
The Building
| What it is | Number | Issued by | Renews on | Last cost | Kept where |
|---|---|---|---|---|---|
| Liquor licence | |||||
| Business licence | |||||
| Health permit | |||||
| Fire safety certificate | |||||
| Music or entertainment licence | |||||
| Sidewalk or outdoor permit | |||||
| Insurance | |||||
People
Certifications that belong to a person rather than the building, and expire per person.
| Name | Certification | Obtained | Expires |
|---|---|---|---|
This is a template for your own use. It is not legal advice, and it is not a list of what you are required to hold. Licensing requirements vary enormously by state, county and city. Check with your own licensing authority and your attorney what applies to you.
Licensing holds every permit and certificate with its renewal date, what it costs and how often it recurs, and sorts them by how close they are. Anything already expired, anything inside fourteen days and anything inside thirty are each marked differently, so the monthly check is a glance rather than a read.
Incidents and Records
Somebody slips on a wet floor near the restrooms on a busy Friday. They say they are fine and they leave. Four months later a letter arrives. Nobody who was working that night is still working for you, nobody wrote anything down, and the only account of what happened belongs to the person making the claim.
That is the whole argument for this system. It costs almost nothing to keep, it is dull, it will feel pointless for months at a time, and then once it is the only thing standing between you and somebody else's version of events.
What gets written down: any injury to anybody, an ejection or an altercation, a refusal of service or a guest cut off, a complaint of any seriousness, an illness claim, property damage or a break-in, and anything where police or an ambulance were called. Facts only, written on the night, by somebody who was there.
Run It Without Software
- Write it on the night, before anybody goes home. A record made two days later is worth a fraction of one made at the time, and it is obvious which is which.
- Facts only, in order. The time, where in the building, who was involved, who saw it, exactly what happened, and what you did.
- Do not write what you think somebody meant or intended. Write what was said and done. Opinions in a record are what get read back to you later.
- Get the names of anybody who saw it, including guests if they will give them, and a short account from each while it is fresh.
- Take photographs if there is anything to photograph, such as a spill, damage or a hazard, before it gets cleaned up.
- Note whether anybody outside was called and what they said or did.
- File them all in one place, in date order, and keep them for as long as your attorney tells you to.
Refusing service, or cutting somebody off, gets written down every time. Write the time, who made the decision, what you observed that led to it, what was said, and what happened afterwards including whether the person drove away. States differ a great deal on what a bar is responsible for when a guest who was over-served causes harm. Ask your own attorney what your state expects, and keep the record either way, because a note made that night carries a great deal more weight than a recollection months later.
Every Time
The Paper This System Needs
Incident Report FormWritten on the night, facts only. Print a few and keep them behind the bar.
1. What Kind of Incident
- Injury to a guest
- Injury to a member of staff
- Ejection or altercation
- Refusal of service, or a guest cut off
- Complaint
- Illness claim
- Property damage, theft or break-in
- Police or emergency services attended
- Other
2. Who Was Involved
3. What Happened
Facts only, in the order they happened. Write what was said and done, not what you believe anybody intended.
4. Witnesses
| Name | Guest or staff | Contact | What they saw |
|---|---|---|---|
5. What You Did About It
Including first aid given, whether anybody outside was called, and what happened afterwards.
6. If Service Was Refused
7. Evidence Kept
- Photographs taken
- Camera footage saved and stored separately
- Till or receipt records kept
- Written statements from witnesses
8. Signatures
This form is a record-keeping template, not legal advice. Record facts only. What you are required to report, how long you must keep records, and what liability you carry all vary by state and locality, particularly for alcohol service. Consult your attorney and your insurer about what applies to you, and about anything that has actually happened.
Incidents is the written record, kept in one place and filterable by kind: injuries, ejections, a guest refused service, theft or a break-in, property damage, complaints, illness claims, and anything where police or an ambulance attended. It is a record-keeping aid rather than legal advice, and the value is simply that the entry exists, made on the night, where you can find it years later.
Keeping It Real
Every operations system fails the same way, and it is not by being abandoned. It is by being completed. Three weeks in, the closing checklist is being signed every night and about two thirds of it is being done. Nobody is lying exactly. The list has just become a thing you sign at the end of a shift rather than a thing you work through, and from the outside it looks like it is working perfectly.
This is the failure mode that makes operations different from the other three playbooks. A pour cost that stops being measured goes obviously blank. A checklist that stops being done keeps producing a signed sheet every night, and you find out when an inspector opens a cooler.
Run It Without Software
- Put two or three things on each list that leave evidence. A temperature written down, a till figure, a keg count. You can check those against reality without asking anybody.
- Spot-check one item a week, at random, against what was signed. It takes two minutes and everybody knowing it happens is most of the effect.
- When something is missed, ask about the item before you ask about the person. Most skipped items are badly placed, ambiguous, or genuinely impossible in the time available.
- Read a month of sheets once a month and find the items that get skipped most. That list tells you what to change.
- Cut anything that has been on the list for six months and never mattered. A list that is too long is the main reason lists get signed without being done.
- Change the list when the bar changes. New equipment, a new layout or a new menu all leave the checklist quietly out of date.
- Keep the sheets. They are what let you answer a question about a specific night months later.
Week one, write down what your best people already do at open and close. Week two, put the lists in use and start collecting signatures. Week three, write the training list and the equipment schedule. Week four, build the licence register and the incident forms, and run the first spot-check on a signed sheet. After that it is five minutes a shift and half an hour a month.
Work the Rollout
Each completed checklist run is kept, so a month of them is something you can look back through rather than a pile of paper in a drawer. That is what makes the monthly read practical: you can see which nights a list was completed and which items are being marked done every time without fail, which is usually the first clue that a list has become a signature.
The Bar Should Not Need You in It
An owner who had not taken a full week off in four years finally did, after three months of this. Nothing dramatic happened while she was away. The open and the close were on the wall, the new starter had been signed off against a list before she left, the ice machine had been serviced on a date somebody chose, and the one incident that happened got written up properly by a supervisor who had a form to hand. She said the strangest part was that nobody called her.
That is what this playbook is for. Not paperwork for its own sake, and not a set of rules to catch people out. It is getting the bar out of people's heads and onto paper, so that it runs the same way on a Tuesday as it does on a Friday, whoever is on, whether or not you are in the building.
- Print the closing checklist above and hand it to whoever is closing. Ask them to mark anything on it they do not normally do, and anything they do that is not on it.
- Write down the three pieces of equipment that would hurt most if they stopped, and find out when each was last serviced.
- Find your liquor licence and check the renewal date. Put it in your calendar with a reminder 60 days out.
- Print two incident forms and put them somewhere the bar can reach in ten seconds.
None of that takes an hour, and it is more written down than most bars have. The rest of this playbook is just doing the same thing for everything else.
Questions operators ask.
What gets asked the first time somebody writes a checklist.